What is the process?
1) Fill in the information form for the building you
need on the quote page.
2) An acknowledgement email will be sent back to you
and may have a question or two for you asking for
clarification.
3) An As Big As A Barn Metal Building Associate will
review your information.
4) A proposal will be put together for the building
specified by you or and email stating that we can not
meet your requirements.
5) Changes and alterations to the design, color,
insulation, features and options is normal and
expected.
6) Once you approve the building and submit your down
payment, the design is submitted for engineering
approval.
7) A packet of information for your review on the
building colors, options and ship to destination are
sent to you for final conformation.
8) Please apply for your building permit, should one
be required. Permit regulations vary by county and
State, start investigating the requirer in your area
as soon as you have decided to add a building to your
property.
9) Make arrangements to have the building erected or
if you plan to do it your self get prepared.
10) Plans return from engineering with stamp, your
representative releases your building for productions.
11) Your building is delivered to your site, with
instruction manual and all components.
How long does the process take?
1) A proposal should come in 1 to 2 weeks.
2) Engineering Package in 7 to 10 working days.
3) Permit approval in 2 to 3 weeks. Check with your
local building department for lead times in your area
to get approval.
4) Building delivered in 2 to 3 weeks.
Are there other things I need to think about?
Sure, there are many things.
1) Exposure rating, wind speed and snow load for your
area are important for the building design. Also,
soil, pad and slab or pier requirements for your area.
2) Asthetics.
• Windows – How many? What size? Single or Double
pane?
• Doors – Personal Access - How many?
• Doors – Large Opening – How many? What Size? Allow
2’ for door hardware on height to building eave and 6”
on total width.
What type? – Roll-up or Sectional Garage?
• Siding and Roof – What Colors? What gauge? We offer
26ga as standard in “Classic Rib” pattern with a 45
year warranty.
• Trim – What color?
• Insulation – Vapour Barrier, or an R11.74 Foil Sided
¼” Poly Insulation or something in fiber glass. Note:
Fiber glass insulation over 3” thick is harder to
install.
• Landscaping or placement of items around building
once built.
|